广东水利水电Issue(4):41-44,67,5.
官良水文站缆道设计及主索垂度分析
Cableway Design and the Main Cable Sag Analysis of Guanliang Hydrological Station
宋小兵 1张荣上 1易琴2
作者信息
- 1. 广东省水利水电科学研究院,广东广州 510635
- 2. 葛洲坝集团第六工程有限公司,湖北宜昌 443002
- 折叠
摘要
Abstract
The design of Guanliang cableway hydrological station on the Luodingjiang River in Zhaoqing has been introduced.And the rationality of choosing cableway main line parameter has been analyzed as well.According to the actual situation of the project, the left bank of the flow measurement section is slope, so it is designed as steel pillars with cable which is suitable.The right bank is a lower, so it is designed as steel tower without cable which is suitable.The cableway with one side backing to the hills another side backing to the ground is Representative.This kind of cableway design provides good representative for relevant engineering design in hydrology cableway design.关键词
官良水文站/缆道/主索垂度Key words
Guanliang hydrological station/hydrology cableway/main cable sag分类
天文与地球科学引用本文复制引用
宋小兵,张荣上,易琴..官良水文站缆道设计及主索垂度分析[J].广东水利水电,2015,(4):41-44,67,5.