测绘基准欠缺条件下工程测绘项目实施的关键技术

张文兵 洪剑 徐柏松

港工技术Issue(3):82-86,5.
港工技术Issue(3):82-86,5.

测绘基准欠缺条件下工程测绘项目实施的关键技术

Key Technology of Surveying and mapping Project in lack of datum

张文兵 1洪剑 1徐柏松1

作者信息

  • 1. 中交第二航务工程勘察设计院有限公司,湖北武汉 430060
  • 折叠

摘要

Abstract

In this paper,we take an overseas waterway engineering surveying and mapping project as an example to discuss two major problems during the implementation of the project. They are the determination of the plane coordinate system and the elevation datum under the situation that the basic surveying material is lacking. This paper summarized the technical scheme,implementation plan,material processing and data analysis method that were adopted in the sample project. The results and conclusions can provide useful reference for the domestic surveyors in the similar surveying projects.

关键词

国外水运工程/坐标系统/高程基准/GPS水准

Key words

the overseas waterway engineering/coordinate system/height datum/GPS level

分类

天文与地球科学

引用本文复制引用

张文兵,洪剑,徐柏松..测绘基准欠缺条件下工程测绘项目实施的关键技术[J].港工技术,2014,(3):82-86,5.

港工技术

1004-9592

访问量0
|
下载量0
段落导航相关论文