印尼某电站码头工程泊位长度优化分析

刘奇虎

港工技术Issue(4):10-11,50,3.
港工技术Issue(4):10-11,50,3.

印尼某电站码头工程泊位长度优化分析

Analysis of Berth Length Optimization of Indonesia Power Plant Terminal Project

刘奇虎1

作者信息

  • 1. 中国港湾工程有限责任公司,北京 100027
  • 折叠

摘要

Abstract

Based on one power plant terminal project in Indonesia,the length of coal unloading berth in the bidding document is compared with the optimized length that is approved in the detailed design,which shows otherwise that the execution of overseas projects,especially EPC projects,require not only the promotion of China standards and codes to the world,but also the thorough investigation and exact grasp of local market,China standards must combine with local conditions to reduce the project risk and gain higher economic benefit.

关键词

电站/码头/设计船型/泊位长度

Key words

power plant/terminal/design shipform/berth length