Abstract
The engineering Geological Investigation and relevant achievements were described briefly for the first contract period of DB01 bid section of Hong Kong-Zhuhai-Macao Bridge Project. It was proposed to apply rock-socketed piles(steel pipe composite piles)to the bridge abutment foundation by estimating and analyzing the bearing capacities of different types of piles. The pile foundation parameters were proved accurate and reliable by comparing the theoretical calculation results with the experimental data of pile bearing capacity.关键词
港珠澳大桥/地质勘察/桩基参数/单桩承载力/嵌岩桩Key words
Hong Kong-Zhuhai-Macao Bridge/geological investigation/pile foundation parameters/pile bearing capacity/rock-socketed piles分类