摘要

Abstract

In Huanghua port ore mineral phase-1 project, sea reclamation is carried out by filling with harbor basin dredged soil. Due to low quality of dredged soil and high working load, the traditional foundation improvement option or concepts cannot satisfy the requirements for engineering cost and time limit. Based on the project investment, the employer's operating requirement and time limit are taken as the core demands of the design option, the foundation improvement option is analyzed and discussed from the aspects of engineering geological condition, improvement standard (operating requirement) and construction application.

关键词

矿石堆场/地基处理/软土地基/标准

Key words

ore mineral stockyard/foundation improvement/soft base/standard