Abstract

Lunzua Hydropower Station of Zambia is a diversion-type hydropower project designed with high water head of 269.78m and long diversion pipe of 5.28 km. Combined with the engineering geological conditions, an intro-duction was made on the arrangement of diversion route, the structural design of open channel, pressure forebay and penstock.

关键词

水电站/引水系统/设计

Key words

Hydropower station/diversion system/design