小溶江水利枢纽大坝碾压混凝土高温期施工技术

陆佳荣

广西水利水电Issue(3):37-38,46,3.
广西水利水电Issue(3):37-38,46,3.

小溶江水利枢纽大坝碾压混凝土高温期施工技术

Technical measures for RCC dam construction of Xiaorongjiang Hydraulic Complex during high-temperature period

陆佳荣1

作者信息

  • 1. 青狮潭水库灌区管理站,广西 桂林 540001
  • 折叠

摘要

Abstract

An introduction was made on the general information of Xiaorongjiang Hydraulic Complex, including the climate of dam site. For the construction of RCC main dam during high-temperature period, effective temperature control measures had been adopted for relerant processes such as storage of raw materials;adjustment of mixing pro-portion;mixing, transport and filling of concrete.

关键词

高温期/碾压混凝土施工/温控措施/小溶江水利枢纽

Key words

High-temperature period/RCC construction/temperature control measure/Xiaorongjiang Hydraulic Complex