The high material feeding platform of ZangMu Hydropower Project was arranged on the right dam abut⁃ment at EL.3313.75 m,and was attached to the right crest road. The material receiving platform was located by steep slope. Conventional concrete or steel structures may lead to much construction difficulties and high costs. Therefore,design was optimized combined with actual landform. Steel structures permit simple fabrication tech⁃nique,convenient assembly and dismantle. The design made full use of these advantages with tripod supports and anchor concrete base being adopted,which solve the supporting and reinforcing problem of cable machine feeding platform. It is a practical scheme and may be reference for similar project.关键词
藏木水电站/供料平台/设计Key words
ZangMu Hydropower Project/material feeding platform/design分类