广西水利水电Issue(6):89-91,96,4.
马马崖一级水电站折线坝坝顶变形监测设计
Crest deformation monitoring design for zigzag-axis main dam of Mamaya Cascade-I Hydropower Project
邓荣欢 1龚刚1
作者信息
- 1. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081
- 折叠
摘要
Abstract
The main dam of Mamaya Cascade-I Hydropower Project is designed with zigzag axis,rendering much limitations for arrangement of crest deformation monitoring equipment. Therefore,the structure and arrangement of surface monitoring piers were improved; hydrostatic leveling system was adopted for calibration of vacuum laser alignment system,which properly solved the crest deformation monitoring problem for zigzag-axis dam and may be reference for similar projects.关键词
折线坝/变形监测/坝顶/马马崖一级水电站工程Key words
Zigzag-axis dam/deformation monitoring/dam crest/Mamaya Cascade-I Hydropower Project分类
建筑与水利引用本文复制引用
邓荣欢,龚刚..马马崖一级水电站折线坝坝顶变形监测设计[J].广西水利水电,2014,(6):89-91,96,4.