广西水利水电Issue(3):67-68,81,3.
三连水库除险加固工程设计
Design of Sanlian Reservoir reinforcement project
刘永豪 1李飞燕2
作者信息
- 1. 哈密十三师水务管理有限公司,新疆 哈密 839000
- 2. 新疆兵团第十三师勘测设计院,新疆 哈密 839000
- 折叠
摘要
Abstract
In view of the existing problems of Sanlian Reservoir, combined with the engineering geological condi⁃tions, a reinforcement design scheme was determined based on comparison and selection of alternatives, incorporat⁃ing composite geo-membrane at upstream dam slope with seepage control of whole reservoir bottom. The expected purpose has been achieved with obvious seepage proof effects since construction was completed.关键词
水库/除险加固/工程设计Key words
Reservoir/reinforcement/design分类
建筑与水利引用本文复制引用
刘永豪,李飞燕..三连水库除险加固工程设计[J].广西水利水电,2015,(3):67-68,81,3.