Practices and Experiences of Risk Management in International Projects of Power Design Institute

黄胜 1陈剑锋1

作者信息

  • 1. 广西电力工业勘察设计研究院,广西 南宁 530023
  • 折叠

摘要

Abstract

With the case of G Power Design Institute, this paper analyses the practices and experiences of risk man-agement in international projects, expatiates on the risks encountered and the main countermeasures by Power Design Institutes nowadays in the preliminary stage of engaging in international projects. Therefore it is concluded that the risks in international projects is not uncontrollable. The risks may be predicted, prevented, decreased, dissolved or transferred properly through risk management system and effective countermeasures.

关键词

电力设计院/国际工程/风险管理

Key words

Power Design Institute/international project/risk management

分类

管理科学

引用本文复制引用

黄胜,陈剑锋..电力设计院开展国际工程风险管理的实践与经验[J].红水河,2014,(3):87-90,104,5.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文