Jinwo hydropower station has the Pelton turbine of the maximum numbers of buckets and the biggest single installed capacity in Asia. The adopted ABB UNITROL 5000 excitation system shall be tested and commissioned on site before handover to make sure that all indicators are in line with national standards and industry requirements so as to ensure safe, reliable and stable operation of the system.

关键词

励磁系统/金窝水电站

Key words

excitation system/Jinwo hydropower station