Felou hydropower station is located on the Senegal River within the territory of the Republic of Mali, Africa. The project is a run-off hydropower station, with a total installed capacity of 3 × 21MW. The paper makes an introduction to the general layout of the hydropower station and the design of each sub-item project. The international standards, whose design process catering to the World Bank's or the European Investment Bank's lending require-ments, are adopted for the project to get supporting loans from them.关键词
马里费鲁水电站/国际标准/工程设计Key words
Felou hydropower station in Mali/international standard/project design分类