| 注册
首页|期刊导航|红水河|挤压边墙技术在柬埔寨王国达岱河水电站面板堆石坝应用

挤压边墙技术在柬埔寨王国达岱河水电站面板堆石坝应用

刘经军

红水河Issue(5):26-29,4.
红水河Issue(5):26-29,4.

挤压边墙技术在柬埔寨王国达岱河水电站面板堆石坝应用

Application of Extruding Sidewall Technology in Concrete Face Rockfill Dam for Tatay Hydropower Station in Cambodia

刘经军1

作者信息

  • 1. 葛洲坝集团第一工程有限公司,湖北 宜昌 443002
  • 折叠

摘要

Abstract

Extruding sidewall construction is to construct a semi-previous concrete sidewall by a sidewall extruding machine before filling of each bedding material layer for concrete face rockfill dam, and then fill dam material at the downstream side according to design and repeats these procedures after qualified in rolling compaction. This con-struction method simplifies the construction procedures, speeds up the construction progress and ensures the filling quality of bedding materials.

关键词

达岱河水电站/面板堆石坝/挤压边墙施工

Key words

Tatay hydropower station/concrete face rockfill dam/construction of extruding sidewall

分类

建筑与水利

引用本文复制引用

刘经军..挤压边墙技术在柬埔寨王国达岱河水电站面板堆石坝应用[J].红水河,2014,(5):26-29,4.