摘要
Abstract
For continuous construction of concrete liner in long and large tunnel, the full-section needle-beam steel form jumbo has the advantages of high speed, good quality, high safety level and low cost etc. The paper makes an in-troduction to the construction technology of the above-mentioned jumbo and the quality control measures in concrete lining for headrace tunnel of Dashankou-II hydropower station in Xinjiang.关键词
全断面针梁式钢模台车/引水隧洞/混凝土衬砌/大山口二级水电站Key words
full-section needle-beam steel form jumbo/headrace tunnel/concrete lining/Dashankou-II hydropower station分类
建筑与水利