首页|期刊导航|红水河|大型全断面针梁式钢模台车在大山口二级水电站引水隧洞混凝土衬砌中的应用

大型全断面针梁式钢模台车在大山口二级水电站引水隧洞混凝土衬砌中的应用

姚桂禄

红水河Issue(6):44-48,5.
红水河Issue(6):44-48,5.

大型全断面针梁式钢模台车在大山口二级水电站引水隧洞混凝土衬砌中的应用

Application of Full-section Needle-beam Steel Form Jumbo in Concrete Lining for Headrace Tunnel of Dashankou-II Hydropower Station

姚桂禄1

作者信息

  • 1. 广西水电工程局,广西 南宁 530001
  • 折叠

摘要

Abstract

For continuous construction of concrete liner in long and large tunnel, the full-section needle-beam steel form jumbo has the advantages of high speed, good quality, high safety level and low cost etc. The paper makes an in-troduction to the construction technology of the above-mentioned jumbo and the quality control measures in concrete lining for headrace tunnel of Dashankou-II hydropower station in Xinjiang.

关键词

全断面针梁式钢模台车/引水隧洞/混凝土衬砌/大山口二级水电站

Key words

full-section needle-beam steel form jumbo/headrace tunnel/concrete lining/Dashankou-II hydropower station