Abstract

1 000 kV AC transmission and 500 kV AC transmission have different applicable transmission capacity and range. According to the different situation of power station, there should be a reasonable choice of voltage level, matching the corresponding circuits, series compensation degree, switch station. The traditional method uses the BPA simulation software to obtain that by continuous power flow algorithm. But this method is complicated and time-consuming. Calculation is particularly large when electricity has a variety of power demand analysis. This paper presents an algorithm based on the AC line transmission capacity, Matlab software programming is used to achieve the establishment of UHV AC transmission model and economical optimization strategy. The method can use thermal limit, voltage limit, landing stability constraints to get the AC line transmission capacity curve by considering the factor of power network strength. On the basis of this method, an UHV AC transmission model can be built combined with unit capacity annual cost algorithm, which can meet the power transmission of arbitrary transmission capacity and the optimal economic of any transmission distance, has an important reference significance and practical value for the planning and construction of electric transmission lines in China.

关键词

交流线路输电能力/输电模型/单位容量年费用法/经济性优选/Matlab

Key words

line transmission capacity/transmission model/unit capacity annual cost algorithm/economic optimization/Matlab

分类

信息技术与安全科学

引用本文复制引用

杨昊,王丹,刘涤尘..特高压交流输电模型的建立与经济性优选分析[J].电力系统保护与控制,2015,(3):91-96,6.

基金项目

国家高技术发展计划项目(863计划)(2011AA 05A119);国家电网公司重大专项资助项目课题(SGCC- MPLG029-2012)This work is supported by National High-tech R & D Program of China (863 Program)(No.2011AA05A119) and Major Projects of State Grid Corporation of China (No. SGCC-MPLG029-2012) (863计划)

电力系统保护与控制

OA北大核心CSCDCSTPCD

1674-3415

访问量0
|
下载量0
段落导航相关论文