电力系统保护与控制Issue(4):150-154,5.
基于全站同步时钟扩展装置的智能变电站同步整组试验方法的研究
Study on the whole system synchronization testing method based on the clock extended device in smart substation
刘海峰 1赵永生 1李辉 1梁文武 1敖非1
作者信息
- 1. 国网湖南省电力公司电力科学研究院,湖南 长沙 410007
- 折叠
摘要
Abstract
The distributed sampling value and its synchronous mode in smart substation are firstly analyzed. Then the advantages, disadvantages and adaptability of the two conventional testing methods are discussed. A new testing method and its function design are proposed based on total station synchronous signal extension device. The synchronous signal which has been laid out in switch yard is used to be the testing reference in this method. Finally, the precision of this method is tested. The results show that the method has high precision and good adaptability.关键词
智能变电站/同步时钟/同步整组试验/延时/差动保护Key words
smart substation/synchronous clock system/whole system synchronization testing/time delay/differential protection分类
信息技术与安全科学引用本文复制引用
刘海峰,赵永生,李辉,梁文武,敖非..基于全站同步时钟扩展装置的智能变电站同步整组试验方法的研究[J].电力系统保护与控制,2015,(4):150-154,5.