电力系统保护与控制Issue(10):44-50,7.
基于综合敏感性分析的时序分布式电源规划
Timing distributed power planning based on a comprehensive sensitivity analysis
摘要
Abstract
In the distribution network, with the permeability of distributed generator increasing, the influence on grid voltage and the network loss will become apparent. This effect is closely related to the location and capacity of distributed generator. A method of planning the timing distributed generator is proposed. First installation node of DG is selected by the comprehensive sensitivity analysis of node voltage and net loss, then optimization methods are used for distributed power capacity optimization. The optimization method is, establishing the objective function in order to reduce the network loss and improve the level of voltage, and establishing the conditions by chance constrained programming method;and doing random flow calculation by using the Monte-Carlo simulation method for random scheduling of DG and load;finally, the genetic algorithm of elitist strategy is employed to solve the model. Results verify the effectiveness of the method of site selection and capacity.关键词
选址/定容/敏感性分析/时序性/分布式电源Key words
site selection/capacity determination/sensitivity analysis/timing characteristics/distributed generator分类
信息技术与安全科学引用本文复制引用
黄付顺,王倩,何美华,陈前宇..基于综合敏感性分析的时序分布式电源规划[J].电力系统保护与控制,2015,(10):44-50,7.基金项目
国家自然科学基金(51307144) (51307144)