| 注册
首页|期刊导航|结构工程师|大跨度公铁两用斜拉桥列车制动力作用下结构响应研究

大跨度公铁两用斜拉桥列车制动力作用下结构响应研究

吕龙 李建中

结构工程师Issue(6):47-53,7.
结构工程师Issue(6):47-53,7.

大跨度公铁两用斜拉桥列车制动力作用下结构响应研究

Responses of Long-span Highway and Railway Cable-stayed Bridge Induced by Train Braking Forces

吕龙 1李建中1

作者信息

  • 1. 同济大学桥梁工程系,上海 200092
  • 折叠

摘要

Abstract

Based on a highway and railway cable-stayed bridge under design, dynamic responses of the struc-ture were analyzed under train braking forces by the nonlinear dynamic time-history analysis method. Viscous dampers were installed between the tower and girders for this bridge. Results were compared for models with viscous dampers and without viscous dampers. It is indicated that the displacements on the beam end and rela-tive displacements between tower and beam were reduced effectively by installing dampers between tower and beam.

关键词

公铁两用斜拉桥/非线性/动力时程分析方法/黏滞阻尼器/列车制动力

Key words

highway and railway cable-stayed bridge/nonlinear/dynamic time-history analysis method/vis-cous damper/train braking force

引用本文复制引用

吕龙,李建中..大跨度公铁两用斜拉桥列车制动力作用下结构响应研究[J].结构工程师,2014,(6):47-53,7.

基金项目

973计划(2013CB036302) (2013CB036302)

结构工程师

OA北大核心CSTPCD

1005-0159

访问量0
|
下载量0
段落导航相关论文