计算机工程与应用Issue(4):249-253,5.DOI:10.3778/j.issn.1002-8331.1303-0284
多节点流水线生产订单接受与调度一体化问题
Integrated order acceptance and scheduling for multi-node flow-line production
摘要
Abstract
In order to make profit maximize when enterprise choice orders and avoid delay punishment loss, an integrated decision method of order acceptance and scheduling for flow-line production enterprise is proposed. In this method, a decision model is built which makes maximize profit as purpose and considering delay punishment to plan order acceptance and scheduling in the meantime, a heuristic solving-algorithm based on simulated annealing process is established for this model solving. A case verifies the model and algorithm are effective.关键词
多节点生产线/订单接受调度一体化/退火过程/启发式算法Key words
multi-node production line/integrated order acceptance and scheduling/annealing process/heuristic algorithm分类
机械制造引用本文复制引用
宋李俊,赵虎..多节点流水线生产订单接受与调度一体化问题[J].计算机工程与应用,2015,(4):249-253,5.基金项目
国家自然科学基金重点项目(No.51035001);重庆市教委科学技术研究项目(No.KJ130812);重庆市基础与前沿研究计划项目(No.cstc2013jcyjA40027)。 ()