交通标准化Issue(21):27-32,6.
基于OD反推技术的城市新建高等级道路交通量预测方法--以镇江市长江隧道为例
Traffic Volume Forecasting Method for Urban High Grade Road Based on OD-Matrix Estimation Model:A Case Study of Yangtze River Tunnel in Zhenjiang
王磊 1纪书锦 1李星星 1王鹤1
作者信息
- 1. 镇江市规划设计研究院,江苏 镇江 212001
- 折叠
摘要
Abstract
With the beginning of a new round of city road network adjustment, the number of high grade road construction, such as tunnel and elevated, is growing. It is important for policy makers to get the pre-dicted traffic volume of the new road quickly and accurately during the early stages of the decision-mak-ing because it is a costly project. However, the traditional four-stage method is time-consuming, unable to meet the job needs. The article introduced the method of traffic forecasting for urban high grade road based on OD-matrix Estimation Model, and its result was compared with the result of four-stage method combined with the case of Yangtze River tunnel in zhenjiang.关键词
城市高等级道路/交通量预测/OD反推/TranscadKey words
urban high grade road/traffic volume forecasting/OD-matrix estimation model/Transcad分类
交通工程引用本文复制引用
王磊,纪书锦,李星星,王鹤..基于OD反推技术的城市新建高等级道路交通量预测方法--以镇江市长江隧道为例[J].交通标准化,2014,(21):27-32,6.