| 注册
首页|期刊导航|机电工程技术|浅析深圳地铁1号线列车转向架综合测试

浅析深圳地铁1号线列车转向架综合测试

朱伟鹏

机电工程技术Issue(6):221-225,5.
机电工程技术Issue(6):221-225,5.DOI:10.3969/j.issn.1009-9492.2014.06.061

浅析深圳地铁1号线列车转向架综合测试

Brief Analysis about Integrated Tests of Bogie on Trains in Shenzhen Metro Line 1

朱伟鹏1

作者信息

  • 1. 深圳市地铁集团有限公司,广东深圳 518040
  • 折叠

摘要

Abstract

Since the Shenzhen Metro Line No.1 engineering project opening and operation of 26 trains, subway trains running gear failure-prone, manifested in the bogie ATC holder and bracket cracking, dead solid traction motor bearings, bogie noise, pantograph cracking and other aspects of the framework. To avoid the occurrence of malignant failures endanger traffic safety incidents, thoroughly investigate the cause of the fault and grasp the 1st line train line running bogie, bogie running gear special comprehensive testing and analyzing are given in this paper.

关键词

地铁列车/转向架/振动/应力/测试/分析

Key words

metro train/truck/vibration/stress testing/analysis

分类

交通工程

引用本文复制引用

朱伟鹏..浅析深圳地铁1号线列车转向架综合测试[J].机电工程技术,2014,(6):221-225,5.

机电工程技术

1009-9492

访问量0
|
下载量0
段落导航相关论文