机电工程技术Issue(6):221-225,5.DOI:10.3969/j.issn.1009-9492.2014.06.061
浅析深圳地铁1号线列车转向架综合测试
Brief Analysis about Integrated Tests of Bogie on Trains in Shenzhen Metro Line 1
朱伟鹏1
作者信息
- 1. 深圳市地铁集团有限公司,广东深圳 518040
- 折叠
摘要
Abstract
Since the Shenzhen Metro Line No.1 engineering project opening and operation of 26 trains, subway trains running gear failure-prone, manifested in the bogie ATC holder and bracket cracking, dead solid traction motor bearings, bogie noise, pantograph cracking and other aspects of the framework. To avoid the occurrence of malignant failures endanger traffic safety incidents, thoroughly investigate the cause of the fault and grasp the 1st line train line running bogie, bogie running gear special comprehensive testing and analyzing are given in this paper.关键词
地铁列车/转向架/振动/应力/测试/分析Key words
metro train/truck/vibration/stress testing/analysis分类
交通工程引用本文复制引用
朱伟鹏..浅析深圳地铁1号线列车转向架综合测试[J].机电工程技术,2014,(6):221-225,5.