首页|期刊导航|采矿与安全工程学报|深井软岩巷道连续“双壳”治理底鼓机理与技术

深井软岩巷道连续“双壳”治理底鼓机理与技术

杨本生 高斌 孙利辉 杨万斌

采矿与安全工程学报Issue(4):587-592,6.
采矿与安全工程学报Issue(4):587-592,6.

深井软岩巷道连续“双壳”治理底鼓机理与技术

Study on technology and mechanism of continuous“double shell”harnessing floor heave in deep soft-engineering rock roadway

杨本生 1高斌 1孙利辉 1杨万斌2

作者信息

  • 1. 河北工程大学资源学院,河北省资源勘测研究重点实验室,河北省煤炭矿井建设工程技术研究中心,河北 邯郸 056038
  • 2. 河北工程大学土木工程学院,河北 邯郸 056038
  • 折叠

摘要

Abstract

Harnessing floor heave of roadway is one of the difficult but key problems in roadway sup-porting. The influence factors and mechanism of floor heave in the deep soft-engineering rock roadway are analyzed through site investigations and monitoring in the middle-strip track roadway at Xinjing Coal Mine. It is confirmed that the main causes of floor heave are that there is no support in the floor rock,which means the shear failure occurs firstly because of high-stress,and then stratum crushes further into squeezing and flowing because of water leading to further fragmentation. Therefore,the mechanism of the continuous “double shell” harnessing floor heave is studied by using continuous“double shell”to control floor heave and the technique of the continuous“double shell”harnessing floor heave that uses “bottom shallow hole grouting (shallow shell) +deep-anchor-beam with high-pressure grouting (deep shell)”to control floor heave is established. The technique has obtained a good effect.

关键词

深井巷道/工程软岩/底鼓治理/连续“双壳”/支护机理

Key words

deep roadway/soft-engineering rock/harnessing floor heave/continuous“double shell”/support mechanism

分类

矿业与冶金

引用本文复制引用

杨本生,高斌,孙利辉,杨万斌..深井软岩巷道连续“双壳”治理底鼓机理与技术[J].采矿与安全工程学报,2014,(4):587-592,6.

基金项目

国家自然科学基金项目(51174070);河北省自然科学基金项目(E2011402046) (51174070)