摘要

Abstract

In order to reduce environmental risk, a possible and environmental technique to dispose the waste in abandoned coal mines is put forward. The types of injectable waste are analyzed. The principles for selection of target strata are discussed. Three hydraulic filling methods to inject waste in abandoned coal mine, i.e., controlled backfilling, low pressure backfilling filling and high pressure injection, are proposed. In order to achieve project performance, injection pressure, fracture propagation, surface uplift should be detected and the features of injected mixture should be controlled. The initial analysis indicates that it is technically feasible to dispose waste into abandoned coal mines.

关键词

废弃煤矿/采空区塌陷/废弃物处置/液力回填/压裂/裂缝检测

Key words

abandoned coal mines/gob subsidence/waste disposal/hydraulic backfilling/fracturing/detection of fracture

分类

资源环境

引用本文复制引用

冀前辉..废弃煤矿废弃物地下灌注技术可行性探讨[J].煤田地质与勘探,2014,(4):69-71,3.

煤田地质与勘探

OA北大核心CSCDCSTPCD

1001-1986

访问量0
|
下载量0
段落导航相关论文