内蒙古电力技术2015,Vol.33Issue(3):41-43,62,4.DOI:10.3969/j.issn.1008-6218.2015.03.020
600MW机组远动系统改造分析
Analysis of 600 MW Remote System Transformation
潘龙飞 1魏建涛1
作者信息
- 1. 华电内蒙古能源有限公司包头发电分公司,内蒙古 包头 014013
- 折叠
摘要
Abstract
Huadian Inner Mongolia Energy Co.,Ltd., Baotou Power Branch made transformation to the remote system, due to the aging of two generating remote systems, and unreasonable internal software settings, which affected the AGC adjusting function. The problem of AGC adjustment poor performance had been sovled by replacing the remote system's remote server, the measurement and control devices to optimize internal settings, and replacing the old active transmitter to a 2-way active transmitter 4~20 mA analog, which solved the worse performance of AGC. The adjustment performance of the innvoted remote system meet the assessment requirement of the power net.关键词
600MW机组/远动系统/AGC/有功功率变送器/测控装置/阈值/精度Key words
600 MW unit/remote system/AGC/active transmitter/measurement and control devices/threshold/accuracy分类
信息技术与安全科学引用本文复制引用
潘龙飞,魏建涛..600MW机组远动系统改造分析[J].内蒙古电力技术,2015,33(3):41-43,62,4.