南水北调与水利科技Issue(2):395-398,4.DOI:10.13476/j.cnki.nsbdqk.2015.02.045
南水北调京石段应急供水输水损失规律分析
Analysis of water conveyance loss of Bei jing-Shijiazhuang emergency water supply section in South-to-North Water Diversion Project
摘要
Abstract
Water conveyance loss can be affected by many factors, including weather conditions, canal construction quality, and water conveyance flow.Based on the measured water flowdata of Beijing-Shijiazhuang emergency water supply section in the South-to-North Water Diversion Project,water balance principle was adopted to analyze the water conveyance loss rates in the normal season,flood season,and iceseason,which can provide technical support for thewater conveyance operation in the Mid-dle Route of the South-to-North Water Diversion Project.关键词
南水北调京石段/输水损失率/输水时段/水量平衡/分析Key words
Beijing-Shijiazhuang section in the South-to-North Water Diversion Project/water conveyance loss rate/water con-veyance period/water balance/analysis分类
建筑与水利引用本文复制引用
田景环,常思源,黄鑫,王文川..南水北调京石段应急供水输水损失规律分析[J].南水北调与水利科技,2015,(2):395-398,4.基金项目
2013年河南省重点科技攻关计划项目(132102110046) (132102110046)
河南省高校科技创新人才支持计划项目(13HASTIT 034) (13HASTIT 034)