南水北调与水利科技Issue(4):808-812,5.DOI:10.13476/j.cnki.nsbdqk.2015.04.044
不同工况条件下双泉水库溢洪道衬砌裂缝分析
Research of the spillway lining cracks of Shuangquan Reservoir under different working conditions
胡良明 1孙宝成 1张宾2
作者信息
- 1. 郑州大学 水利与环境学院,郑州 450001
- 2. 郑州市水利建筑勘测设计院,郑州 450006
- 折叠
摘要
Abstract
With the w ide application of concrete in engineering, the crack problem has received more attention. Cracks are usually caused by construction or other ext ernal factors, w hich not only affect the aesthet ics of structure, but also affect the structure function because cracks can decrease t he permeability and then induce leaking. In this paper, the spillway concrete lining of Shuan-gquan Reservoir in Anyang County was used as a case study. The finite element model was developed using ANSYS to analyze the varia-tion rules of temperature and stress fields under different working conditions, and to investigate the causes of cracks in the concrete lin-ing and initial position of cracks. The measures for temperature and stress control of concrete w ere proposed.关键词
混凝土/衬砌/裂缝/温度场/应力场/温度应力/计算工况Key words
concret e/lining/crack/temperature field/st ress field/temperature stress/working condition分类
建筑与水利引用本文复制引用
胡良明,孙宝成,张宾..不同工况条件下双泉水库溢洪道衬砌裂缝分析[J].南水北调与水利科技,2015,(4):808-812,5.