| 注册
首页|期刊导航|宁夏电力|强腐蚀土壤地区特高压线路砼基础施工技术

强腐蚀土壤地区特高压线路砼基础施工技术

万华

宁夏电力Issue(3):14-19,6.
宁夏电力Issue(3):14-19,6.DOI:10.3969/j.issn.1672-3643.2014.03.004

强腐蚀土壤地区特高压线路砼基础施工技术

Concrete foundation construction technology on UHV transmission line in strong corrosion soil areas

万华1

作者信息

  • 1. 国网宁夏电力公司经济技术研究院,宁夏 银川 750002
  • 折叠

摘要

Abstract

In order to enhance corrosion resistance of UHV transmission line concrete foundation for soil and groundwater, by taking measures of “internal increase and external defense”,first time uses corrosion resistance concrete with high performance and anticorrosive bag wrapped body filling-pile technology in domestic UHV transmission line project. The application result shows that wrapped body filling-pile technology has the advantages such as clear process step,cost saving,high construction effeciency and easily to be spread,it has important reference for project foundation construction and corrosion resistance in strong corrosion soil area.

关键词

特高压输电线路/强腐蚀/灌注桩/防腐

Key words

UHV transmission line/strong corrosion/filling-pile/corrosion resistance