宁夏电力Issue(4):58-62,5.DOI:10.3969/j.issn.1672-3643.2014.03.013
330 MW汽轮发电机组转子振动大的原因分析
The 330 MW generator rotor vibration cause analysis and processing
贺光宇1
作者信息
- 1. 华能宁夏大坝发电有限责任公司,宁夏 青铜峡 751607
- 折叠
摘要
Abstract
In the process of 330 MW turbine units start after the capacity increases improvement, the second-order unbalance of generator rotor slants big,causes the relative bearing vibration over standard alarm,bring about the unit cannot pass the second-order critical speed of generator in the process of unit speeding up. Aiming at this problem, analyzes the generator and exciter rotor vibration,finds out the causes and puts forward corresponding processing method. The result shows that the main reason of generator vibration is the rotor unbalance,through dynamic balancing test, adds the weight on fan rings of both sides of the generator rotor,the generator successfully speeding up to the setting speed of 3 000 r/min,the shaft vibration of the unit reaches good level under steady load condition.关键词
发电机转子/振动/动平衡Key words
generaor rotor/vibration/dynamic balance分类
能源科技引用本文复制引用
贺光宇..330 MW汽轮发电机组转子振动大的原因分析[J].宁夏电力,2014,(4):58-62,5.