热力发电Issue(11):97-103,7.DOI:10.3969/j.issn.1002-3364.2014.11.097
考虑环境成本的火电厂负荷优化分配
Load optimal distribution for power plants with consideration of environmental costs
摘要
Abstract
Against the load optimal distribution problems in power plants after dedusting,desulfurization, and denitrification,a whole plant load distribution model considering environmental cost and a controllable exploration particle swarm optimization (PSO-CE)algorithm satisfying the real-time request of power dis-patching were proposed,from the aspect of improving the plant comprehensive economic benefit.The net coal consumption characteristic model and the multiple contaminants emission concentration characteristic model were constructed on the basis of the unit actual operating data.Then,the load distribution model for optimal comprehensive economic benefit and the self-adaptive load constraint condition were established, based on the dedusting,desulfurization,and denitrification compensation electricity price and the standard expense of pollutants emission.Moreover,the velocity factor of controllable random exploration and maxi-mum velocity limiting factor of dynamic adj ustment were introduced to the standard particle swarm optimi-zation algorithm to balance the computing cost and search ability.Simulations on the load distribution of a power plant with 4 units reveal the validity of the proposed method.关键词
火电厂/负荷优化分配/PSO-CE算法/环境成本/供电煤耗/污染物排放Key words
thermal power plant/load optimal distribution/PSO-CE algorithm/environmental cost/coal con-sumption for power supply/pollutant emission分类
信息技术与安全科学引用本文复制引用
王伟,常浩,苏宏业,石永锋..考虑环境成本的火电厂负荷优化分配[J].热力发电,2014,(11):97-103,7.基金项目
国家863计划重点项目课题资助(2008AA042902) (2008AA042902)
浙江省博士后科研项目择优资助(BSH1302004) (BSH1302004)