人民长江Issue(15):43-46,4.
滇池补水工程干河提水泵站系统总体布置简述
Introduction to general layout of Ganhe River Pumping Station system for Niulan River-Dianchi Lake Water Supplement Project
胡清顺 1王和芬 2何兴3
作者信息
- 1. 云南省调水中心,云南昆明650051
- 2. 云南省水利水电勘测设计研究院,云南昆明650021
- 3. 云南省水文水资源局昆明分局,云南昆明650021
- 折叠
摘要
Abstract
Niulan-River-Dianchi-Lake-Water-Supplement-Project-is-composed-of-Deze-Reservoir-Project-,-Ganhe-River-Pum-ping-Station-and-water-diversion-line-.The-Ganhe-River-Pumping-Station-with-maximum-lift-head-of-233.3-m-is-built-18-km-away-from-the-dam-in-the-reservoir-area-,-which-delivers-water-to-the-Dianchi-Lake-through-the-Panlong-River-channel-.The-Ganhe-River-Underground-Pumping-Station-with-buried-depth-of-150-m-was-a-challenge-in-the-construction-as-it-is-characterized-as-complex-structures-of-underground-chambers-,-difficult-construction-and-more-than-70-m-below-the-reservoir-level-during-operating-period-.-The-formation-and-arrangement-of-inflow-,-pumping-system-and-outflow-system-structures-of-the-pumping-station-,-as-well-as-the-ar-rangement-of-equipment-were-briefly-introduced-.The-pumping-station-was-put-into-operation-with-satisfactory-state-at-the-end-of-2013-.关键词
补水工程/提水泵站/总体布置Key words
water supplement project/pumping station/general layout分类
建筑与水利引用本文复制引用
胡清顺,王和芬,何兴..滇池补水工程干河提水泵站系统总体布置简述[J].人民长江,2014,(15):43-46,4.