| 注册
首页|期刊导航|人民长江|上海浦东新区防汛减灾工程体系现状能力评估

上海浦东新区防汛减灾工程体系现状能力评估

唐迎洲 徐贵泉 高程程

人民长江Issue(17):26-29,62,5.
人民长江Issue(17):26-29,62,5.

上海浦东新区防汛减灾工程体系现状能力评估

Assessment of present capacity of flood control system in Pudong New Zone of Shanghai

唐迎洲 1徐贵泉 2高程程1

作者信息

  • 1. 上海市水务规划设计研究院,上海200233
  • 2. 上海市水务局 水环境研究工作室,上海200112
  • 折叠

摘要

Abstract

There are many problems in the"4 control lines" of sea wall, dike, waterlog control and drainage, such as aged fa-cilities, low construction standard, settlement and sea level rise, etc. , so the reassessment should be carried out for its present control capacity. On the basis of correlative regulations and plan, the capacity of "4 control lines" was assessed by using high precision numerical model. The results show that the controlling capacity of the"4 control lines" is not qualified to some degree. It was suggested that the heightening and reinforcement of the sea wall and weak section of flood wall should be accelerated;the comprehensive regulation of river and lake system in this region should be strengthened; the rebuilt of low-standard drainage system should be promoted.

关键词

防汛墙/除涝/城镇雨水排水/海塘/上海浦东

Key words

flood wall/waterlog control/waterlogging drainage in cities and counties/sea wall/Pudong New Zone of Shanghai

分类

建筑与水利

引用本文复制引用

唐迎洲,徐贵泉,高程程..上海浦东新区防汛减灾工程体系现状能力评估[J].人民长江,2014,(17):26-29,62,5.

基金项目

水利部公益性行业科研专项经费项目(201001069) (201001069)

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文