人民长江Issue(17):26-29,62,5.
上海浦东新区防汛减灾工程体系现状能力评估
Assessment of present capacity of flood control system in Pudong New Zone of Shanghai
摘要
Abstract
There are many problems in the"4 control lines" of sea wall, dike, waterlog control and drainage, such as aged fa-cilities, low construction standard, settlement and sea level rise, etc. , so the reassessment should be carried out for its present control capacity. On the basis of correlative regulations and plan, the capacity of "4 control lines" was assessed by using high precision numerical model. The results show that the controlling capacity of the"4 control lines" is not qualified to some degree. It was suggested that the heightening and reinforcement of the sea wall and weak section of flood wall should be accelerated;the comprehensive regulation of river and lake system in this region should be strengthened; the rebuilt of low-standard drainage system should be promoted.关键词
防汛墙/除涝/城镇雨水排水/海塘/上海浦东Key words
flood wall/waterlog control/waterlogging drainage in cities and counties/sea wall/Pudong New Zone of Shanghai分类
建筑与水利引用本文复制引用
唐迎洲,徐贵泉,高程程..上海浦东新区防汛减灾工程体系现状能力评估[J].人民长江,2014,(17):26-29,62,5.基金项目
水利部公益性行业科研专项经费项目(201001069) (201001069)