Abstract

Wudongde Hydropower Station is a backbone power sources for west-east power transmission and its installed ca-pacity determination involves various factors. For 4 initially proposed installation schemes, the comparison and analysis are con-ducted from the aspects of water resources utilization level, engineering technology condition, and electric power market capacity in the electricity-consumption area, as well as adaptability of long-distance power transmission line, energy indexes, engineer-ing economy and project layout, etc. The comprehensive technical and economic comparison and analysis show that the installed capacity of 10 200 MW for Wudongde Hydropower Station can achieve the best benefit.

关键词

装机容量/水资源利用/经济指标/动能指标/乌东德水电站

Key words

installed capacity/water resources utilization/economic index/energy index/Wudongde Hydropower Station