Wudongde Hydropower Station is the most upper one of the four cascade hydropower stations on lower Jinsha River. Its water diversion and power generation structure is characterized as complex geological and many restricted conditions, large-scale caverns, small intervals between the main caverns. During the design process, the supporting parameters and rock stability analysis of key parts are solved, including the water inlet, diversion tunnel, main and auxiliary caverns, tail water tunnel, tail water outlets, in consideration of terrain condition and general layout as well as using related design specifications, engineering a-nalogy and fine 3D numerical simulation. Finally, the optimized layout of water diversion and power generation structures with better economic index is proposed.关键词