| 注册
首页|期刊导航|人民长江|乌东德水电站建设中水土流失防治措施探讨

乌东德水电站建设中水土流失防治措施探讨

闫峰陵 雷少平 罗小勇 阮娅 樊皓

人民长江Issue(20):103-105,109,4.
人民长江Issue(20):103-105,109,4.

乌东德水电站建设中水土流失防治措施探讨

Research on soil-water loss control measures in development of Wudongde Hydropower Station

闫峰陵 1雷少平 1罗小勇 1阮娅 1樊皓1

作者信息

  • 1. 长江流域水资源保护局 长江水资源保护科学研究所,湖北 武汉430051
  • 折叠

摘要

Abstract

The southwestern China is one of the largest hydropower bases of China, and meanwhile, is also one of fragile eco-logical environment areas with very serious soil-water loss. In the construction of hydropower projects, due to long construction period, large quantity of spoiled materials, severe ground disturbance, the soil-water loss hazard is also severe. Aiming to the Wudongde Hydropower Station on the lower reach of Jinsha River, on the basis of analysis on the characteristics of soil-water loss in the region and in combination with the construction characteristics and vegetation restoration requirements of various con-trol sub-regions in late period, the soil-water loss prevention and control system suitable to the soil-stone mountainous area of southwestern China is researched and put forward, so as to provide reference for soil-water loss control in subsequent hydropower cascade development.

关键词

水土流失/防治分区/乌东德水电站/西南地区

Key words

soil-water loss/zoning for prevention of soil-water loss/Wudongde Hydropower Station/southwestern China

分类

农业科技

引用本文复制引用

闫峰陵,雷少平,罗小勇,阮娅,樊皓..乌东德水电站建设中水土流失防治措施探讨[J].人民长江,2014,(20):103-105,109,4.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文