| 注册
首页|期刊导航|人民长江|乌东德水电站移民安置规划设计与研究

乌东德水电站移民安置规划设计与研究

高润德 张军伟 伍晓涛

人民长江Issue(20):106-109,4.
人民长江Issue(20):106-109,4.

乌东德水电站移民安置规划设计与研究

Design and study on resettlement planning for Wudongde Hydropower Station

高润德 1张军伟 1伍晓涛1

作者信息

  • 1. 长江勘测规划设计研究有限责任公司 库区处,湖北 武汉430010
  • 折叠

摘要

Abstract

Wudongde Hydropower Station, the most upstream cascade hydropower station on the lower Jinsha River, is planned to be constructed. There are several challenges of extensive submerged areas, large population and high proportion of ethnic mi-norities in the land acquisition for construction. In view of the characteristics of land acquisition, both the technological means and investigation methods are innovated, and the acquisition system for property index and photography technology are used, which have greatly improved the accuracy and efficiency of the investigation, providing a basis for compilation of the planning out-line. The working process and main achievement of resettlement planning are introduced, and the physical indicator investigation for resettlement and the experience in compilation of planning outline are summarized to provide references for future resettlement planning.

关键词

建设征地/移民安置/安置规划/乌东德水电站

Key words

land acquisition/reservoir resettlement/resettlement planning/Wudongde Hydropower Station

分类

社会科学

引用本文复制引用

高润德,张军伟,伍晓涛..乌东德水电站移民安置规划设计与研究[J].人民长江,2014,(20):106-109,4.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文