人民长江Issue(21):13-16,4.
南水北调沙河渡槽预制安装测量监理质量控制
Quality control on erection measurement for Shahe River aqueduct in South - to - North Water Diversion Project
万建成 1刘彦杰 2余昊1
作者信息
- 1. 长江岩土工程总公司 武汉,湖北 武汉 430010
- 2. 长江三峡勘测研究院有限公司 武汉,湖北 武汉 430074
- 折叠
摘要
Abstract
Through the practice of quality control in supervision on the neasurenent of Shahe River aqueduct works of Middle Route Project of South - to - North Water Diversion,the quality control in construction neasurenent and detection links,and the nain quality control points and detection nethods in the supervision are introduced according to the characteristics of precast U -type bean aqueduct. In the practice,not only the current specifications are strictly inplenented,but also the whole detection process is strictly controlled and updated. The experiences can provide references for the quality control of construction neasure-nent supervision of sinilar aqueduct or bridge works.关键词
预制/安装/检测/质量控制/沙河渡槽/南水北调中线工程Key words
precast/installation/detection/quality control/Shahe River aqueduct/Middle Route Project of South- to -North Water Diversion分类
建筑与水利引用本文复制引用
万建成,刘彦杰,余昊..南水北调沙河渡槽预制安装测量监理质量控制[J].人民长江,2014,(21):13-16,4.