摘要

Abstract

The conprehensive value deternination nethod for hydropower engineering can be divided into three layers on the basis of the project size as well as geology conplexity. For the projects characterized as snall scale and sinple geological condi-tion or for the planning and feasibility research stage,the rock nass paraneters can be deternined by engineering geological anal-ogy nethod and supplenented by rock nass classification through field geological survey and a few laboratory tests. For the pro-ject with nediun scale and conplex geological conditions,the in - situ testing should be carried out during the prelininary design phase,and the rock nass paraneters should be deternined by engineering geological analogy. For large - sized project,the non-ographic study is necessary besides the above nentioned nethod.

关键词

岩体力学参数/综合取值方法/工程规模/地质条件/水利水电工程

Key words

rock nechanics paraneters/conprehensive value deternination/engineering scale/geological condition/hydro-power projects