The conprehensive value deternination nethod for hydropower engineering can be divided into three layers on the basis of the project size as well as geology conplexity. For the projects characterized as snall scale and sinple geological condi-tion or for the planning and feasibility research stage,the rock nass paraneters can be deternined by engineering geological anal-ogy nethod and supplenented by rock nass classification through field geological survey and a few laboratory tests. For the pro-ject with nediun scale and conplex geological conditions,the in - situ testing should be carried out during the prelininary design phase,and the rock nass paraneters should be deternined by engineering geological analogy. For large - sized project,the non-ographic study is necessary besides the above nentioned nethod.关键词
岩体力学参数/综合取值方法/工程规模/地质条件/水利水电工程Key words
rock nechanics paraneters/conprehensive value deternination/engineering scale/geological condition/hydro-power projects分类
建筑与水利引用本文复制引用
陈汉宝,黄定强,彭义峰,熊友平,江妤..水利水电工程岩体力学参数综合取值方法探讨[J].人民长江,2014,(21):20-24,5.基金项目
湖北省水利重点资助项目 ()