摘要
Abstract
With the maximum dam height of 210 m, Dagangshan Hydropower Station is characterized as large scale, compli-cated geology, high seismic intensity, difficult construction management and high safety risk. In order to improve the construction management level of the project, by referring to the construction experience of similar hydropower projects in China, Guodian Dadu River Hydropower Development Co. , Ltd has successively established the decision-making support system for dam con-crete temperature control, simulation system for dam construction progress, remote monitoring system and collision prevention sys-tem for cable cranes, etc. , and on the basis, established a integrated digital management platform. The development and appli-cation of the system has realized an overall management for safety, quality, progress, quantity measurement of the project con-struction.关键词
建设管理/数字化管理/应用成果/大岗山水电站Key words
construction management/digital management/application result/Dagangshan Hydropower Station分类
建筑与水利