大岗山水电站水轮机凑合节安装工艺及质量控制

王辉 李金明

人民长江Issue(22):87-89,3.
人民长江Issue(22):87-89,3.

大岗山水电站水轮机凑合节安装工艺及质量控制

Installation process and quality control of expansion joints of hydraulic turbines in Dagangshan Hydropower Station

王辉 1李金明2

作者信息

  • 1. 国电大渡河大岗山水电开发有限公司,四川 石棉625409
  • 2. 中国水利水电第七工程局有限公司 机电安装分局,四川 彭山620860
  • 折叠

摘要

Abstract

The turbine spiral case and steel penstock are connected with expansion joints in Dagangshan Hydropower Station. The spiral case, steel penstock and expansion joints are all forged by B610CF steel, and the welding technology is complicated and higher demands should be fulfilled so as to avoid fissure. In this paper, the choice of installation time, installation process and welding control of expansion joints are introduced, including welding sequence, welding materials and heat treatment after welding. Through non-destructive tests, the qualified rate of expansion joints reached to 98. 81% by applying the above meas-ures.

关键词

蜗壳/压力钢管/凑合节/焊接

Key words

spiral case/steel penstock/expansion joints/welding