人民长江Issue(23):46-50,5.
乌东德水电站坝基固结灌浆方法试验研究
Test study on dam foundation consolidation grouting at Wudongde Hydropower Station
樊少鹏 1丁刚 1黄小艳 1肖碧1
作者信息
- 1. 长江勘测规划设计研究有限责任公司 枢纽设计处,湖北 武汉430010
- 折叠
摘要
Abstract
Wudongde Hydropower Station is located in narrow valley area with steep bank slope and high-thin dam body. Conventional consolidation grouting with cover weight could not be well conducted due to its several interferences with concrete placement and the contact grouting for dam body. Therefore two kinds of field grouting, namely"direct consolidation grouting on bedrock without cover weight" and "consolidation grouting on bedrock without cover weight plus pipe-guiding grouting for sur-face layer with cover weight" were carried out for Ⅱ and Ⅲ1 rock mass. The test results show that it is feasible to apply non-cover-weight consolidation grouting for the dam foundation. However local zones with geological defects in Ⅱ level rock mass shall be grouted with closer space and the surface layer of gradeⅢrock mass should be treated with supplementary pipe-guiding grouting.关键词
固结灌浆/裸岩无盖重引管法灌浆/灌浆试验/乌东德水电站Key words
consolidation grouting/bedrock pipe-guiding grouting without cover weight/grouting test/Wudongde Hydropow-er Station分类
建筑与水利引用本文复制引用
樊少鹏,丁刚,黄小艳,肖碧..乌东德水电站坝基固结灌浆方法试验研究[J].人民长江,2014,(23):46-50,5.