Abstract
In consideration of the close relation between jobsite transportation for construction and construction schedule, con-struction layout and material yard, the transportation trend and intensity of jobsite construction materials were analyzed in combi-nation with the principle and standard of traffic planning -layout, and the jobsite traffic planning -layout scheme was deter-mined. The construction practice indicates that the road and bridge were arranged reasonably, the traffic scheme can fully satisfy the transportation demands in rush-hour, the vehicular traffic is safe and effective. It provides a solid foundation for engineering construction and operation.关键词
施工布置/场内交通规划/安全高效/枕头坝一级水电站Key words
construction layout/jobsite transportation planning/safety and efficient/Zhentouba I Hydropower Station分类
建筑与水利引用本文复制引用
刘道文,肖培伟,魏雄伟,唐岷..枕头坝一级水电站施工区交通规划布置[J].人民长江,2014,(24):50-53,4.