向家坝水电站施工设备管理经验总结

王毅华 谭志国

人民长江Issue(2):5-9,27,6.
人民长江Issue(2):5-9,27,6.DOI:10.16232/j.cnki.1001-4179.2015.02.002

向家坝水电站施工设备管理经验总结

Summary of management experiences of construction equipments of Xiangjiaba Hydropower Station

王毅华 1谭志国1

作者信息

  • 1. 中国长江三峡集团公司向家坝工程建设部,四川宜宾644600
  • 折叠

摘要

Abstract

The construction of Xiangjiaba Hydropower Station is characterized as large total concrete amount and high construc -tion intensity.In the equipment management and operation , the method of system engineering is used to overcome the difficulties such as the multi -kind of equipments , high technical requirement , large interference among equipment operation and high safety risk.The management measures are demonstrated , including reasonably arranging the equipments in stages and perfecting the op -eration and guarantee mechanism , improving the productive efficiency by using new technique and scientific -coordinated man-agement method , strengthening the operation safety and risk management and control , raising the efficiency and safety manage-ment level of equipments dismantle and relocation , which promotes the realization of the construction goal .Meanwhile , the oper-ating and productive efficiency and economic profit are improved through the exploration of management technology of large scaled construction equipment .

关键词

大型施工设备/施工设备管理/浇筑强度/安全风险/向家坝水电站

Key words

large scaled construction equipment/construction equipment management/pouring intensity/safety risk/Xiangjiaba Hydropower Station