人民长江Issue(2):44-46,61,4.DOI:10.16232/j.cnki.1001-4179.2015.02.011
大型沉井群在向家坝水电站地基处理中的应用
Application of large sinking well group in foundation treatment of Xiangjiaba Hydropower Station
高鹏1
作者信息
- 1. 中国长江三峡集团公司向家坝工程建设部,四川宜宾644600
- 折叠
摘要
Abstract
The longitudinal cofferdam of Xiangjiaba Hydropower Station was built on deep overburden layer , therefore the se-lection of reasonable foundation treatment scheme was the key for the smooth construction diversion .After repeated comparison -selection and research , the large sinking well group composed of 10 sinking wells was determined .Through innovating the design concept of sinking well group , the thought of large sinking well with small interval was put forward and in the combination of the practical condition , the plane arrangement , structural design , underground seepage control were suggested .Aiming at the com-plicated conditions of small well interval , large sinking depth , thicker overburden layer , large difference of stratums containing big boulder , the optimized sinking construction measures were proposed .The rock filled concrete was applied to fill the sinking well, thus satisfactory technological and economical effects were obtained .关键词
大型沉井群/地基处理/深厚覆盖层/向家坝水电站Key words
sinking well group/foundation treatment/deep overburden layer/Xiangjiaba Hydropower Station分类
天文与地球科学引用本文复制引用
高鹏..大型沉井群在向家坝水电站地基处理中的应用[J].人民长江,2015,(2):44-46,61,4.