向家坝水电站大坝基础处理设计
Dam foundation treatment design of Xiangjiaba Hydropower Station
张永涛 1曾祥喜 1史艳2
作者信息
- 1. 中国电建集团中南勘测设计研究院有限公司,湖南长沙410014
- 2. 中国建设银行湖南省分行,湖南长沙410001
- 折叠
摘要
Abstract
The geological condition of Xiangjiaba Hydropower Station is complicated with main geological defects of the fracture belts at deflection core area , the compressed fracture belts and the soft interlayer .The design method of dam foundation treatment is presented from three aspects of foundation surface selection , seepage control design and reinforced grouting of foundation .Es-pecially, according to the contradiction of foundation lift force and foundation seepage stability , we have proposed a solution of controlling drainage system innovatively , i.e., setting valves in the drainage outlets of the dam foundation to adjust the drainage volume according to the monitoring data in the initial reservoir impoundment .关键词
坝基处理/渗控体系/抽排体系/重力坝/向家坝水电站Key words
dam foundation treatment/seepage control system/drainage system/gravity dam/Xiangjiaba Hydropower Station分类
天文与地球科学引用本文复制引用
张永涛,曾祥喜,史艳..向家坝水电站大坝基础处理设计[J].人民长江,2015,(2):76-80,5.