| 注册
首页|期刊导航|人民长江|向家坝水电站大坝基础处理设计

向家坝水电站大坝基础处理设计

张永涛 曾祥喜 史艳

人民长江Issue(2):76-80,5.
人民长江Issue(2):76-80,5.DOI:10.16232/j.cnki.1001-4179.2015.02.019

向家坝水电站大坝基础处理设计

Dam foundation treatment design of Xiangjiaba Hydropower Station

张永涛 1曾祥喜 1史艳2

作者信息

  • 1. 中国电建集团中南勘测设计研究院有限公司,湖南长沙410014
  • 2. 中国建设银行湖南省分行,湖南长沙410001
  • 折叠

摘要

Abstract

The geological condition of Xiangjiaba Hydropower Station is complicated with main geological defects of the fracture belts at deflection core area , the compressed fracture belts and the soft interlayer .The design method of dam foundation treatment is presented from three aspects of foundation surface selection , seepage control design and reinforced grouting of foundation .Es-pecially, according to the contradiction of foundation lift force and foundation seepage stability , we have proposed a solution of controlling drainage system innovatively , i.e., setting valves in the drainage outlets of the dam foundation to adjust the drainage volume according to the monitoring data in the initial reservoir impoundment .

关键词

坝基处理/渗控体系/抽排体系/重力坝/向家坝水电站

Key words

dam foundation treatment/seepage control system/drainage system/gravity dam/Xiangjiaba Hydropower Station

分类

天文与地球科学

引用本文复制引用

张永涛,曾祥喜,史艳..向家坝水电站大坝基础处理设计[J].人民长江,2015,(2):76-80,5.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文