向家坝水电站蓄水安全监测评价

张勇

人民长江Issue(2):111-114,4.
人民长江Issue(2):111-114,4.DOI:10.16232/j.cnki.1001-4179.2015.02.028

向家坝水电站蓄水安全监测评价

Safety monitoring and evaluation of impoundment of Xiangjiaba Hydropower Station

张勇1

作者信息

  • 1. 中国长江三峡集团公司向家坝工程建设部,四川宜宾644600
  • 折叠

摘要

Abstract

To strengthen the safety monitoring of Xiangjiaba Hydropower Station in the impoundment period , the deformation of the structures ( horizontal and longitudinal displacement , openings of joint and bedrock deformation ) , seepage and seepage pres-sure, and stress and strain were monitored .The special hydraulic monitoring was implemented to the flood release and energy dis -sipation structures.The results show that after the impoundment , the deformation, stress and strain and seepage pressure of the dam body, water diversion and power generation system at right bank and the side slope tends to be stable , and the variation law is reasonable .The operation of the hydro -complex structures is in a normal state .

关键词

水库蓄水/安全监测/大坝变形/分析评价/向家坝水电站

Key words

impoundment/safety monitoring/dam deformation/analysis and evaluation/Xiangjiaba Hydropower Station

分类

建筑与水利

引用本文复制引用

张勇..向家坝水电站蓄水安全监测评价[J].人民长江,2015,(2):111-114,4.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文