人民长江Issue(6):66-70,5.DOI:10.16232/j.cnki.1001-4179.2015.06.019
丹江口大坝300 t级升船机安装及调试技术分析
Erecting and debugging techniques of 300 t-level ship-lift in Danjiangkou Hydro-complex
张德华 1杨联东 1程靖华 2袁云桥2
作者信息
- 1. 中国水利水电第三工程局有限公司,陕西 西安710000
- 2. 南水北调中线水源有限公司,湖北 丹江口442700
- 折叠
摘要
Abstract
Two-stage ship-lifts of vertical stage and inclined stage adopted for Danjiangkou Hydro-complex is the only one in China. Many technique difficulties were encountered during its erection process, including lifting of large parts, welding and fabrication of steel frame high above the ground, sliding construction of large parts on steel track as well as in-situ debugging. Through cooperation of design engineers and construction workers, all the technique difficulties were solved successfully, which accumulated experiences for erection and debugging of other similar equipment.关键词
300 t级升船机/安装及调试/技术分析/丹江口大坝Key words
ship-lift of 300t-level/erection and debugging/technique analysis/Danjiangkou Dam分类
交通工程引用本文复制引用
张德华,杨联东,程靖华,袁云桥..丹江口大坝300 t级升船机安装及调试技术分析[J].人民长江,2015,(6):66-70,5.