柬埔寨额勒赛电站面板堆石坝施工动态管理实践
Dynamic management practice of slab rockfill dam construction of Lower Stung Russei Chrum Hydropower Station in Cambodia
朱新元 1陈卓2
作者信息
- 1. 中国华电额勒赛下游水电项目 柬埔寨 有限公司,北京100031
- 2. 长江勘测规划设计研究有限责任公司 施工设计处,湖北 武汉430010
- 折叠
摘要
Abstract
In slab rockfill dam construction of Lower Stung Russei Chrum Hydropower Station in Cambodia, affected by various environmental and unpredictable factors, the dam construction period is a challenge for all construction parties. On the basis of analyzing various unfavorable factors and in combination with the engineering practice, a series of management measures were a-dopted to strengthen the dynamic management for dam construction, including cofferdam flood control standard adjustment, strengthening of the materials supply, dynamic adjustment of temporary building facilities. The engineering practice shows that this management measures can effectively improve the construction efficiency and ensure the construction period, which provides experience to similar hydropower projects at home and abroad.关键词
工程管理/施工工期/动态调整/海外工程/额勒赛水电站Key words
engineering management/construction period/dynamic adjustment/oversea projects/Stung Russei Chrum Hydro-power Station分类
建筑与水利引用本文复制引用
朱新元,陈卓..柬埔寨额勒赛电站面板堆石坝施工动态管理实践[J].人民长江,2015,(7):34-35,43,3.