人民黄河Issue(9):98-100,3.DOI:10.3969/j.issn.1000-1379.2014.09.032
引黄入冀补淀工程沉沙池设计优化研究
Research on Desilting Basin of Yellow River-to-Baiyangdian Water Transfer Project
陈玉培 1王伟 1杨长庚1
作者信息
- 1. 河南省水利勘测设计研究有限公司,河南郑州450008
- 折叠
摘要
Abstract
The Yellow River is a heavily silt-laden river,water and sediment diversion are simultaneous. Building desilting basin at canal head of the Yellow River Diversion Project is a key to success. The principle of quasi-hydrostatic sedimentation method was used in the selected two desilt-ing basins analysis and calculation. In order to save the land and investments,it chose the desilting basin of canal bottom 450 m wide plan. Ac-cording to the calculations,the annual deposition volume was 2. 33 million m3,a large amount of sediment needed to be treated and dealing with the sediment would be the biggest issue of environment in the Yellow River-to-Baiyangdian Water Transfer Project. After many research,recent sed-iment treatment program is as follows:To reduce the impact of sediment to the surrounding environment of desilting basin,preference low-lying and idle land to stack sediment and leveling it. As a source of silt soil it can be used by engineering.关键词
沉沙池/设计/方案优化/引黄入冀补淀工程Key words
desilting basin/design/scheme optimization/Yellow River-to-Baiyangdian Water Transfer Project分类
建筑与水利引用本文复制引用
陈玉培,王伟,杨长庚..引黄入冀补淀工程沉沙池设计优化研究[J].人民黄河,2014,(9):98-100,3.