引黄入冀补淀工程沉沙池设计优化研究

陈玉培 王伟 杨长庚

人民黄河Issue(9):98-100,3.
人民黄河Issue(9):98-100,3.DOI:10.3969/j.issn.1000-1379.2014.09.032

引黄入冀补淀工程沉沙池设计优化研究

Research on Desilting Basin of Yellow River-to-Baiyangdian Water Transfer Project

陈玉培 1王伟 1杨长庚1

作者信息

  • 1. 河南省水利勘测设计研究有限公司,河南郑州450008
  • 折叠

摘要

Abstract

The Yellow River is a heavily silt-laden river,water and sediment diversion are simultaneous. Building desilting basin at canal head of the Yellow River Diversion Project is a key to success. The principle of quasi-hydrostatic sedimentation method was used in the selected two desilt-ing basins analysis and calculation. In order to save the land and investments,it chose the desilting basin of canal bottom 450 m wide plan. Ac-cording to the calculations,the annual deposition volume was 2. 33 million m3,a large amount of sediment needed to be treated and dealing with the sediment would be the biggest issue of environment in the Yellow River-to-Baiyangdian Water Transfer Project. After many research,recent sed-iment treatment program is as follows:To reduce the impact of sediment to the surrounding environment of desilting basin,preference low-lying and idle land to stack sediment and leveling it. As a source of silt soil it can be used by engineering.

关键词

沉沙池/设计/方案优化/引黄入冀补淀工程

Key words

desilting basin/design/scheme optimization/Yellow River-to-Baiyangdian Water Transfer Project