基于 FCE 的桥梁运营阶段风险分析

梁晓飞 李忠梅 郑小燕

山东理工大学学报(自然科学版)Issue(4):1-5,5.
山东理工大学学报(自然科学版)Issue(4):1-5,5.

基于 FCE 的桥梁运营阶段风险分析

Risk estimation in bridge operation stage based on fuzzy comprehensive evaluation

梁晓飞 1李忠梅 1郑小燕2

作者信息

  • 1. 山东理工大学建筑工程学院,山东淄博255049
  • 2. 合肥工业大学交通运输工程学院,安徽合肥230009
  • 折叠

摘要

Abstract

In order to control bridge accident at the source and improve the safety performance at the bridge operation stage ,risk assessment mode ,risk acceptance criteria and risk level evalua‐tion criteria were established from the mechanism of risk .Then ,taking into account the risk loss of uncertainty and ambiguity ,fuzzy comprehensive evaluation method of the consequences of fail‐ure was created based on the fuzzy mathematics method and analytic hierarchy process to quantify the risk of loss and complete risk evaluation .Example show s that the method is feasible and ef‐fective .

关键词

风险估计/层次分析法/风险损失/隶属度函数

Key words

risk estimation/analytic hierarchy process/risk losses/membership functions

分类

交通工程

引用本文复制引用

梁晓飞,李忠梅,郑小燕..基于 FCE 的桥梁运营阶段风险分析[J].山东理工大学学报(自然科学版),2015,(4):1-5,5.